2/2019 Conveyor Belt Diversion - Pennsylvania State University
~5" of the belt exposed above the final road surface. (Pic 2) 3. Backfill the trench and compact with a tamper. (Pic 3 & 4) 4. Place stones at the end of the diversion to control erosion, but be careful not to prevent flow from freely leaving the belt. 5. Mark Conveyor Belt Diversion with reflective posts along the