Mines Regulations, 2003

Shaft Safety and Shaft Inspections 92 Notice of shaft design changes 93 Lining of compartments 94 Manways 95 Rescue from hoist – shaft without manway 96 Access to shafts 97 Guarding of shaft openings 98 Shaft obstructions 99 Devices for landing conveyance 100 Barrier to water in shaft bottom 101 Isolating the shaft station 102 Weekly shaft ...

Speeding fines and demerit points (Department of Transport ...

31-40km/h. $643. 12. 41km/h and above. $1,286. 16. and 6 months suspension. For example, if you commit a speeding offence of 25km/h over the speed limit, you will be allocated 4 demerit points for that offence. If you commit a second speeding offence of 32km/h over the speed limit within 1 year, you will be allocated 6 demerit points for the ...

How safe is your mine hoist? - Canadian Mining Journal

Considering that hoist systems have heavy payloads travelling at high speeds, any failure is likely to have fatal and/or expensive consequences. Mine hoists, however, are large constructs spread over massive areas and maintenance time windows are limited.

THE GROWING USE OF HAZARDOUS PRIMARY VENTILATION …

The shafts did not have "dog legs" (horizontal off-sets) in them due to their intended purpose (hoisting) and/or method of construction (vertical sinking). Larger mines requiring higher airflows had a number of unequipped surface intake and exhaust shafts due to the limited air-carrying capacity of a …

Voith - Mining Technology | Mining News and Views Updated ...

As of 01/04/2006 Voith Turbo & Co. KG, Crailsheim, Germany, is taking over Valvex Ventiltechnik , Bergisch Gladbach, Germany. Valvex Ventiltechnik, founded in 1971, specializes in developing and producing explosion-proof solenoid valves and valve groups that are used primarily in …

ABB Hoisting Equipment for the Transalpine Gotthard Base ...

at a speed of 16 m/s. At the top of the shaft the cars are dumped and ... safety regulations (TAS), which are among the most stringent in the world. As a complement to the ... Cage hoist Service hoist Shaft diameter 9.0 m 9.0 m Shaft depth 800 m 800 m Net load 38.4 t 1.6 t Design speed 16 m/s 4 m/s

CONSTITUTION OF THE STATE OF ARIZONA ARTICLE XIX …

CONSTITUTION . OF THE . STATE OF ARIZONA . ARTICLE XIX . MINES . The office of Mine Inspector is hereby established. The Legislature, at its first session, shall enact laws so regulating the operation

Health Activity Certification or Hoisting Engineers ...

30 CFR 75.155 and 30 CFR 77.105 (Hoisting Engineers Qualification) establish the procedures under which miners are qualified to operate hoists (Steam Driven/Electrical-UG; Slope & Shaft Sinking Operation-Sur). For mines located in states that do not have provisions for qualifying hoist operators, 30 CFR 75.155/77.105 requires mine operators to ...

Subpart R. Personnel Hoisting - GovRegs

SECTION § 56.19104 - Clearance at shaft stations. SECTION § 56.19105 - Landings with more than one shaft entrance. SECTION § 56.19106 - Shaft sets. SECTION § 56.19107 - Precautions for work in compartment affected by hoisting operation. SECTION § 56.19108 - Posting warning signs during shaft work. SECTION § 56.19109 - Shaft inspection and ...

30 CFR Subpart R - Personnel Hoisting | CFR | US Law | LII ...

§ 57.19105 Landings with more than one shaft entrance. § 57.19106 Shaft sets. § 57.19107 Precautions for work in compartment affected by hoisting operation. § 57.19108 Posting warning signs during shaft work. § 57.19109 Shaft inspection and repair. § 57.19110 Overhead protection for shaft deepening work. § 57.19111 Shaft-sinking ladders.

Mine shafts and winding systems - NSW Resources Regulator

cycle) of mine shafts and winding systems. This code applies to all mine shafts and winding systems in underground mines, including shaft sinking winding systems, emergency egress winding systems, people and material winding systems and material winding systems where people may be lifted (e.g. for shaft inspections or winding system maintenance).

Mobile Crane Code of Practice 2006 - WorkSafe.qld.gov.au

This Queensland code of practice was preserved as a code of practice under section 284 of the Work Health and Safety Act 2011. ... with work, not only those for which regulations and codes of practice exist. Mobile crane - Code of Practice 2006 (PN11180) Page 7 of 68

Sailing Manual For All Farrier Designs - Chesapeake Multihulls

A long shaft motor is the minimum required, and the extra long 25" shaft motors are the best. A remote control can also help make operation very easy with aft cabin models. With weight being important, try to choose the lightest possible outboard. There are a number of specialist 'Sail Boat' motors

Guide to machinery and equipment safety

PN10596 Version 3 Last updated March 2019 – Guide to machinery and equipment safety 3 Introduction A guide to machinery and equipment safety is provided to assist persons conducting a business or undertaking (PCBU) and workers to comply with their duties under the

MODULE 4 - LIFTING AND RIGGING - FEMA

n Describe the proper use of swivel hoist, steel angle brackets, and concrete screws. n Understand the proper use of wire ropes, wire rope fittings, end terminations, and tighteners. n Explain the use of slings and sling arrangements. n Describe the use of chains for rigging and lifting.

(PDF) The design of push-pull primary and secondary ...

Figure 8 K2 shaft internal layout (note 60/40 split and 2 guide ropes only for cage) Figure 9 4 x 2 x 55 kW (110 kW) 1.250 mØ fans blowing into RB3 single 2.2 mØ intake raise on surface

What are the problems associated with deep shaft mining ...

Answer: A better question would be what aren't the problems associated with deep shaft mining. I guess if one were to rank these by seriousness and cost inefficiency, it would go something like this…. First the labor force is an extremely small pool of highly-skilled professionals who do extreme...

Code of ia Code - Article 7. Hoisting

§ 45.2-742. (Effective October 1, 2021) Operations of hoisting equipment. A. The speed of the cage, car, or trip in a shaft or slope or on a surface incline shall not exceed 1,000 feet per minute when a miner is being hoisted or lowered. B. When moving the platform or work deck, every miner traveling thereon shall have a safety belt secured. C.

Forklift safety - reducing the risks

5 Forklift safety — reducing the risks What employers must do You must provide site-specific and refresher training to maintain and enhance your employees' skills. You must ensure employees receive familiarisation training for any new forklift (it may have different controls or varying

HOT METAL HANDLING HOIST REQUIREMENTS - Crane 1

3. Hoist Brakes: Each independent hoist unit shall have one of the following arrangements: Two holding brakes (one of which is mounted on a gear reducer shaft) plus control braking means shall be provided. Each brake shall have a torque of at least equal to a full load hoisting torque at the point that the brake is …

RISK MANAGEMENT FOR OPERATING A WINCH

winch industries pty. ltd. abn 57 003 958 923 2 coin street, moorooka. q. 4105 po box 206, acacia ridge. q. 4110 ph. 0738751568 fax 0732774316

SECTION 14611 MONORAIL HOIST AND TROLLEY

hoisting speed with a minimum allowance of 15 percent and a maximum allowance of 50 ... industry standards and federal regulations prior to shipment of the equipment. ... be motorized and driven by an electric motor through a gear reduction unit and drive shaft. Trolley motor and drive shall be as specified in Paragraph 14611-2.03F. The motor ...

California Code of Regulations, Title 8, Section 1616.6 ...

When hoisting employees into and out of drill shafts that are up to and including 8 feet in diameter, all of the following requirements shall be met: (1) The employee shall be in either a personnel platform or on a boatswain's chair. (2) If using a personnel platform, subsections (a) through (n) of this section apply.

Queensland Consolidated Regulations

Speed 272. Brakes Subdivision 3 - Installing, operating, maintaining and testing winders, slope haulages and hoists 273. Operating requirements for winders, slope haulages and hoists 274. Risk assessment and controls for winders, slope haulages and hoists 275. Operating manually operated winder, slope haulage and hoist equipment 276.

UNDERGROUND VENTILATION (METALLIFERROUS MINES) …

shafts, (where no personnel are exposed), there is a practical limit to tolerable air velocity in main intakes (shafts and declines) and main development openings where persons travel and work. Dust generation is one problem deriving from intake velocities in excess of 6m/sec.

30 CFR § 57.19061 - Maximum hoisting speeds. | CFR | US ...

§ 57.19061 Maximum hoisting speeds. The safe speed for hoisting persons shall be determined for each shaft, and this speed shall not be exceeded. Persons shall not be hoisted at a speed faster than 2,500 feet per minute, except in an emergency.

Operating forklift trucks safely | WorkSafe.qld.gov.au

Observe speed limits and ensure you can make a safe stop at any time. Avoid rapid acceleration, deceleration and quick turns. Drive carefully on wet or slippery surfaces or when pedestrians are near. Reduce speed when making a turn.

Guidance Note QGN 30 - resources.qld.gov.au

Shaft construction utilising the blind sink technique involves repetitive work cycles of drilling, blasting, extracting earth and material, installing ground support, formwork and concreting sequences to construct a shaft. The cycles are repeated until the shaft reaches the intended depth. Refer page 9.

ABB Mine Hoist Systems

The AHM 110 Advant Hoist Monitor is an independent unit that provides protection against over-speed and overwinding. Drive systems ABB is the leader in drive technology. The latest technology, DriveIT ACS 6000SD, with DTC, Direct Torque Control, using IGCT, Integrated Gate Commutated Thyristors, for torque and speed control of AC motors is now ...

1926.1431 - Hoisting personnel. | Occupational Safety and ...

When hoisting an employee in storage tank (steel or concrete), shaft and chimney operations, the following requirements must be met: 1926.1431(s)(1) The employee must be in a personnel platform except when the employer can demonstrate that use of a personnel platform is infeasible; in such a case, a boatswain's chair must be used.